The project area is excavated as needed, followed by formwork and the installation of stone base.

We use a minimum 3500 psi strength concrete with fiber reinforcement in the mix. Color is added in the concrete truck so you are assured the entire slab is integrally colored, not just the surface.

Placement and finishing of the slab.

Following the application of a secondary color, the slab is stamped.

Stamping Complete

The next day the slab is pressure washed, joints are cut to minimize cracking, and two coats of sealer are applied to complete the job. The site is then thoroughly cleaned of all debris and ruts from trucks, if any, are filled with topsoil and seeded.